The “Leonard’s Bridge Culvert” has been inspected and filled back in for the winter months, the replacing of the culvert will happen in spring 2022. The road has a limit of 23,000 lbs.
Be aware there is no tar as a top surface so slow down to go over it, may be rough.
Dirigo Timberlands was unable to complete the job of replacing the culvert this fall as planned due to the high water levels.
Thank you for you patience.